Articles



  • Evaluation of the Surrounding Traffic Due to the New Parking Lot of Rusun TOD Pondok Cina Station Project

  • Amount Beam Reinforcement Analysis with Software ETABS (Thamrin Nine Tower Project Phase 1)

  • Comparative Analysis of Pile Foundation’s Bearing Capacity with Several Methods based on CPT and SPT Result (Thamrin Nine Tower Project Phase 1)

  • Earned Value Analysis

  • Analysis of Rainwater Drainage at Tower 1 of Rusun TOD Pondok Cina Station Project

  • Analysis of Static Earthquake Forces at Tower 1 of Rusun TOD Pondok Cina Station Project

  • Ciawi (Cipayung) Dry Dam Bottom Outlet Work Method

  • Diversion Channel Wall Stability And Slope Stability Analysis Using Slope/W Software

  • Flood Discharge Analysis of The Ciliwung Watershed To Determine The Dimensions Of The Diversion and Downstream Channels

1 4 5 6 7 8 14