Articles



  • Concrete 3D Printing

  • Evaluation of the Surrounding Traffic Due to the New Parking Lot of Rusun TOD Pondok Cina Station Project

  • Amount Beam Reinforcement Analysis with Software ETABS (Thamrin Nine Tower Project Phase 1)

  • Comparative Analysis of Pile Foundation’s Bearing Capacity with Several Methods based on CPT and SPT Result (Thamrin Nine Tower Project Phase 1)

  • Earned Value Analysis

  • Analysis of Rainwater Drainage at Tower 1 of Rusun TOD Pondok Cina Station Project

  • Analysis of Static Earthquake Forces at Tower 1 of Rusun TOD Pondok Cina Station Project

  • Ciawi (Cipayung) Dry Dam Bottom Outlet Work Method

  • Diversion Channel Wall Stability And Slope Stability Analysis Using Slope/W Software

1 6 7 8 9 10 16