Evaluation of the Surrounding Traffic Due to the New Parking Lot of Rusun TOD Pondok Cina Station Project
Amount Beam Reinforcement Analysis with Software ETABS (Thamrin Nine Tower Project Phase 1)
Comparative Analysis of Pile Foundation’s Bearing Capacity with Several Methods based on CPT and SPT Result (Thamrin Nine Tower Project Phase 1)
Analysis of Rainwater Drainage at Tower 1 of Rusun TOD Pondok Cina Station Project
Analysis of Static Earthquake Forces at Tower 1 of Rusun TOD Pondok Cina Station Project
Ciawi (Cipayung) Dry Dam Bottom Outlet Work Method
Diversion Channel Wall Stability And Slope Stability Analysis Using Slope/W Software