In under one group, Bagus Alfian, Brilliant Palagian, and Erial Delano are interning in Construction of the Mandiri Bumi Slipi IT Building.

The Mandiri Bumi Slipi IT Building has 32 stories and a land area of 11303m2. This building’s construction began on January 17, 2022 and will be completed on December 3, 2023. The design and build technique was employed in the development of the IT Mandiri Bumi Slipi building. Later, IT Bumi Slipi would use a non-symmetrical building shape at the bottom with modern materials.

During the internship, students supported as site engineers, assisting project managers with technical planning and material construction by providing all working drawings, performing necessary construction calculations, and determining material technical data specifications and the volume of construction workers.