BINUS Road To 45 Gabung Binus Icon
Gabung Binus Icon MULAI DARI SINI
  • BINUS UNIVERSITY
  • Contact Us
    • About Us
      • Introduction
        • Greetings from The Head of Department
        • Vision & Mission
        • Career Prospects
      • About Civil Engineering Program
        • Accreditation
        • History
        • The Sustainable Development Goals (SDGs)
        • Strategic Plan (RENSTRA)
      • Laboratory Courses
        • Soil Mechanics Laboratory
        • Surveying Laboratory
        • Construction Material Technology Laboratory
        • Fluid Mechanics Laboratory
        • Highway Engineering Laboratory
        • Traffic Engineering Laboratory
        • BIM Laboratory and Drawing Construction
      • People
        • Organizational Structure
        • Lecturers
        • Laboratory Staff
        • Advisory Board
      • Students and Alumni
        • Student Achievement
        • Alumni Testimonials
    • Academics
      • Program Objective
      • Student Outcomes
      • Curriculum Overview
      • Course Structure
      • Prerequisites
      • Quality Controlled Examination (UPM)
      • Minor Program
      • Mobility Program
      • Enrichment Program
    • Activities
      • News
      • Events
      • Internships
      • Partnership
      • Achievements
      • Organization and Community
    • Publications
      • Web Articles and Selected Publications
      • List of Publications and Research
      • Student Gallery
    • Apply Now
      • Enrollment
      • Admission Schedule
      • Entry Requirements
      • Tuition Fee
      • Scholarship
    • Home
    • Articles / Student Research
    • Analysis Time Efficiency on the ROW 28 Phase 2 Development Project Using the Earned Value Method

    Analysis Time Efficiency on the ROW 28 Phase 2 Development Project Using the Earned Value Method

    • Articles
    • Student Research

    Share It :
    Civil Engineering
    Faculty of Engineering
    BINUS UNIVERSITY
    LOCATION
    Jl. K. H. Syahdan No. 9, Kemanggisan, Palmerah Jakarta 11480, Indonesia Phone +62 21 534 5830, +62 21 535 0660 ext. 2352 Fax +62 21 530 0244
    CONTACT US
    Phone
    +628568874887
    Email
    civilengineering.binus@gmail.com
    GET CONNECTED ON
    SOCIAL MEDIA
    Copyright © BINUS Higher Education. All rights reserved