Amount Beam Reinforcement Analysis with Software ETABS (Thamrin Nine Tower Project Phase 1)
19 December 2020
Comparative Analysis of Pile Foundation’s Bearing Capacity with Several Methods based on CPT and SPT Result (Thamrin Nine Tower Project Phase 1)
19 December 2020
Earned Value Analysis
19 December 2020
Evaluation of the Surrounding Traffic Due to the New Parking Lot of Rusun TOD Pondok Cina Station Project
19 December 2020
Analysis of Rainwater Drainage at Tower 1 of Rusun TOD Pondok Cina Station Project
19 December 2020
Analysis of Static Earthquake Forces at Tower 1 of Rusun TOD Pondok Cina Station Project
19 December 2020
Ciawi (Cipayung) Dry Dam Bottom Outlet Work Method
19 December 2020
Diversion Channel Wall Stability And Slope Stability Analysis Using Slope/W Software
19 December 2020
Flood Discharge Analysis of The Ciliwung Watershed To Determine The Dimensions Of The Diversion and Downstream Channels
19 December 2020