Characteristic of Seabed Current Velocity Changes around Submarine Pipeline due to Variation of Seabed Current in Transition Depth
Study of Flow Characteristic of Side Channel Spillway at Flood Control Dry Dam
Evaluation of the Surrounding Traffic Due to the New Parking Lot of Rusun TOD Pondok Cina Station Project
Analysis of Rainwater Drainage at Tower 1 of Rusun TOD Pondok Cina Station Project
Analysis of Static Earthquake Forces at Tower 1 of Rusun TOD Pondok Cina Station Project
Ciawi (Cipayung) Dry Dam Bottom Outlet Work Method
Diversion Channel Wall Stability and Slope Stability Analysis using Slope/W Software
Flood Discharge Analysis of the Ciliwung Watershed to Determine the Dimensions of the Diversion and Downstream Channels
Analysis of Open Drainage Dimension Calculation