Research Interest
My research interests are statics, estimating cost, construction project management, suverying and foundation engineering
Selected Publication
- Arumsari, Putri, & Karim, M. M. (2020). Identification of dominant factors for the delays in building construction project in kepulauan Anambas. 426. doi:10.1088/1755-1315/426/1/012040
- Suhendra, A., Prahara, E., Arumsari, P., Wulandari, T., & Juliastuti. (2020). Efficiency measurement of transjakarta corridors towards people activities using DEA method (study case: Corridor 1 and corridor 2). 426. doi:10.1088/1755-1315/426/1/012050
- Arumsari, P., Wijayanti, Y., & Ramadhan, N. F. (2021). Building maintenance priority assessment for building components. 729. doi:10.1088/1755-1315/729/1/012023
- Arumsari, Putri, Juliastuti, Hidayat, I., Pierre, A. J., & Pahlevi, C. A. (2021). Rapid assessment for housing in Indramayu, West Java-Indonesia. 794. doi:10.1088/1755-1315/794/1/012014
- Arumsari, Putri, & Tanuwijaya, E. (2021). Pipeline installation using horizontal directional drilling method (HDD). 794. doi:10.1088/1755-1315/794/1/012009
- Wicaksono, R. W., Juliastuti, & Arumsari, P. (2021). Integration building information modeling (BIM) to track the time for controlling of budget and labor productivity (case study: Warehouse project). 794. doi:10.1088/1755-1315/794/1/012037
- Rachmayanti, W., & Arumsari, P. (2021). Risk factors analysis affecting project time delay in construction projects using CATWOE analysis. 794. doi:10.1088/1755-1315/794/1/012010
- Arumsari, Putri, & Sulistio, H. (2022). Soft system methodology for maintenance and treatment budgeting for public-rented flats. Facilities, 40. doi:10.1108/F-06-2021-0056
- Widiaputra, A. B., & Arumsari, P. (2021). Analysis of the dominant factors causing cost overrun in building construction projects. 794. doi:10.1088/1755-1315/794/1/012008
- Arumsari, Putri, Suhendra, A., & Indira, H. (2018). Risk factors affecting the quality of high rise office building projects in DKI Jakarta province. 195. doi:10.1088/1755-1315/195/1/012010
- Arumsari, Putri, & Xavier, C. (2020). Cost and time analysis on the selection of formwork installation method. 426. doi:10.1088/1755-1315/426/1/012042
- Arumsari, Putri, & Tanachi, R. (2018). Value engineering application in a high rise building (a case study in Bali). 195. doi:10.1088/1755-1315/195/1/012015
- Arumsari, Putri, & Rarasati, A. D. (2017). Maintenance strategy for public-rented residential building: a case study in Jakarta, Indonesia. Built Environment Project and Asset Management, 7. doi:10.1108/BEPAM-11-2015-0067
- Juliastuti, Arumsari, P., & Setyandito, O. (2018). Spatial Data and Catchment Discretization for Assessment Coastal Urban Drainage Performance Using GIS and MIKE URBAN-SWMM. 195. doi:10.1088/1755-1315/195/1/012018
- Setyandito, O., Hidayat, I., Arumsari, P., Nataadmadja, A. D., & Juliastuti, J. (2018). DEVELOPMENT OF SIMPLE INFRASTRUCTURE TO ENHANCE SUSTAINABLE DEVELOPMENT IN PASIR MULYA TOURISM VILLAGE. ICCD, 1. doi:10.33068/iccd.vol1.iss1.96
- Arumsari, Putri, Juliastuti, & Al’Farisi, M. K. (2018). Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects. 109. doi:10.1088/1755-1315/109/1/012033
- Sujana, C. M., Setyandito, O., Arumsari, P., Hidayat, I., Prahara, E., & Nataadmadja, A. (2019). EMPOWERING PASIR MULYA VILLAGE COMMUNITY IN SELF-SUPPORTING VILLAGE INFRASTRUCTURE DEVELOPMENT. ICCD, 2. doi:10.33068/iccd.vol2.iss1.132
- Putra, A. B., Putra, B. A., Meilani, Suhendra, A., & Arumsari, P. (2021). Analysis on risk management of occupational health and safety on ongoing building project. 794. doi:10.1088/1755-1315/794/1/01202