Silvia Risit Maulani is currently interning at the joint venture of Adhi-Nindya-Penta for the Indoor Multifunction Stadium (IMS). The Indoor Multifunction Stadium (IMS) project is a strategic project located in the Gelora Bung Karno (GBK) area. This project is in ring one and is a pilot project. The IMS project is carried out with an accelerated system because the construction of this stadium is required to achieve certain targets. The target was achieved so that the building could be immediately used in the 2023 World Basketball Championship.

Activities:

  1. Quantity surveying
  2. Report joint operation – construction management documents
  3. Monitor material testing activities
  4. Detailing structural drawings